Permission Number | Permission Date | Permission Valid Period | Agency Name | Document |
152-2019 1st revalidation | | | |
Download
|
187-2021 | | | |
Download
|
| | | |
Download
|
D 498 | | | Ban on Road Cutting Permission from 14.12.2018 to 10.01.2019 |
Download
|
RV-11 | 31-Jan-2025 | 01.02.2025 | CPWD |
Download
|
RV-10 | 27-Jan-2025 | 30.01.2025 | PGCIL |
Download
|
P-19 | 27-Jan-2025 | 30.01.2025 | PGCIL |
Download
|
P-20 | 27-Jan-2025 | 30.01.2025 | PGCIL |
Download
|
RV-09 | 23-Jan-2025 | 23/01/2025 | Delhi Transco Ltd. |
Download
|
P-18 | 23-Jan-2025 | 24/01/2025 | IGL |
Download
|
P-17 | 22-Jan-2025 | 23/01/2025 | SE(PH)/EE(W/S) |
Download
|
P-16 | 22-Jan-2025 | 22/01/2025 | IGL |
Download
|
P-14 | 20-Jan-2025 | 21/01/2025 | SE(E-II)/EE(C-II) |
Download
|
P-15 | 20-Jan-2025 | 21/01/2025 | SE(E-II)/EE-Elect.(C-II) |
Download
|
P-13 | 16-Jan-2025 | 17/01/2025 | Bharti Airtel Ltd. |
Download
|
P-12 | 16-Jan-2025 | 17/01/2025 | Ircon International Ltd |
Download
|
P-10 | 13-Jan-2025 | 14/01/2025 | Gigatel solution pvt Ltd. |
Download
|
RV-07 | 13-Jan-2025 | 14/01/2025 | Bharti Airtel Ltd. |
Download
|
P-07 | 13-Jan-2025 | 14/01/2025 | Gigatel solution pvt Ltd. |
Download
|
RV-08 | 13-Jan-2025 | 14/01/2025 | CPWD |
Download
|
P-08 | 13-Jan-2025 | 14/01/2025 | Gigatel solution pvt Ltd. |
Download
|
P-09 | 13-Jan-2025 | 14/01/2025 | Gigatel solution pvt Ltd. |
Download
|
P-11 | 13-Jan-2025 | 14/01/2025 | NBCC (INDIA) Ltd. |
Download
|
P-06 | 13-Jan-2025 | 14/01/2025 | Gigatel solution pvt Ltd. |
Download
|
RV-06 | 09-Jan-2025 | 09/01/2025 | SE(E-II)/EE(C-I) |
Download
|
RV-05 | 09-Jan-2025 | 09/01/2025 | SE(E-II)/EE(D/S) |
Download
|
P-04 | 09-Jan-2025 | 09/01/2025 | MTNL |
Download
|
P-05 | 09-Jan-2025 | 09/01/2025 | NBCC (INDIA) Ltd. |
Download
|
P-02 | 06-Jan-2025 | 06/01/2025 | JIO DIGITAL Fiber |
Download
|
RV-04 | 06-Jan-2025 | 06/01/2025 | SE(E-II)/EE(D/S) |
Download
|
P-01 | 06-Jan-2025 | 06/01/2025 | JIO DIGITAL Fiber |
Download
|
P-03 | 06-Jan-2025 | 06/01/2025 | SH. KULDEEP SHARMA |
Download
|
RV-03 | 03-Jan-2025 | 04/01/2025 | CPWD |
Download
|
RV-02 | 02-Jan-2025 | 03/01/2025 | IGL |
Download
|
RV-01-2025 | 01-Jan-2025 | 03/01/2025 | P2P Networks Pvt. Ltd. |
Download
|
RV-38 | 31-Dec-2024 | 03/01/2025 | P2P Networks Pvt. Ltd. |
Download
|
P-176 | 31-Dec-2024 | 31/12/2024 | CPWD |
Download
|
RV-37 | 30-Dec-2024 | 30/12/2024 | PGCIL |
Download
|
P-174 | 30-Dec-2024 | 30/12/2024 | SE(E-II)/EE(C-II) |
Download
|
P-175 | 30-Dec-2024 | 30.12.2024 | SE(PH)/EE(SM-South) |
Download
|
P-172 | 24-Dec-2024 | 24/12/2024 | CPWD |
Download
|
P-173 | 24-Dec-2024 | 24/12/2024 | Delhi Transco Ltd. |
Download
|
RV-36 | 23-Dec-2024 | 24/12/2024 | SE(E-II)/EE(D/S) |
Download
|
P-170 | 09-Dec-2024 | 10/12/2024 | SE(E-II)/EE(C-I) |
Download
|
P-169 | 09-Dec-2024 | 10/12/2024 | SE(E-II)/EE(D/S) |
Download
|
P-83-II&R-I-7 | 07-Dec-2024 | 09.12.2024 | CPWD |
Download
|
RV-35 | 02-Dec-2024 | 03/12/2024 | CPWD |
Download
|
P-171 | 02-Dec-2024 | 03/12/2024 | IGL |
Download
|
P-167 | 29-Nov-2024 | 29.11.2024 | vindhya telelinkd ltd. |
Download
|
P-168 | 29-Nov-2024 | 29/11/2024 | Bharti Airtel Ltd. |
Download
|
P-143 & Road-V-1148 | 29-Nov-2024 | 14.11.2024 | P2P Networks Pvt. Ltd. |
Download
|
RV-34 | 29-Nov-2024 | 29.11.2024 | powergrid teleservices ltd |
Download
|
P-152 &R-V-1094 | 28-Nov-2024 | 02-12-2024 | CPWD |
Download
|
P-154 & R-V-1100 | 28-Nov-2024 | 02-12-2024 | CPWD |
Download
|
P-166 | 27-Nov-2024 | 27.11.2024 | SE(E-III)/EE(D/S) |
Download
|
P-163 | 26-Nov-2024 | 26.11.2024 | SE(E-I)/EE(Elect-I-BM-II) |
Download
|
P-165 | 26-Nov-2024 | 26.11.2024 | SE(BM-III)/EE(BM-III) |
Download
|
P-164 | 26-Nov-2024 | 26.11.2024 | SE(E-II)/EE(Elect-C-I) |
Download
|
P-161 | 25-Nov-2024 | 26.11.2024 | powergrid teleservices ltd |
Download
|
P-160 | 25-Nov-2024 | 26.11.2024 | powergrid teleservices ltd |
Download
|
P-162 | 25-Nov-2024 | 26.11.2024 | powergrid teleservices ltd |
Download
|
P-159 | 11-Nov-2024 | 25.11.2024 | CPWD |
Download
|
P-158 | 08-Nov-2024 | 08.11.2024 | Bharti Airtel Ltd. |
Download
|
RV-33 | 06-Nov-2024 | 06.11.2024 | SE(E-II)/EE(D/S) |
Download
|
P-157 | 05-Nov-2024 | 06.11.2024 | SE(E-I)/EE(BM-II) |
Download
|
P-156 | 25-Oct-2024 | 25.10.2024 | SE(E-II)/EE(M/N) |
Download
|
RV-32 | 25-Oct-2024 | 28.10.2024 | JIO DIGITAL Fiber |
Download
|
RV-31 2nd Rev. | 23-Oct-2024 | 28.10.2024 | IGL |
Download
|
P-140 &R-IV-231 | 19-Oct-2024 | 19.10.2024 | NBCC (INDIA) Ltd. |
Download
|
P-148 | 16-Oct-2024 | 16/10/2024 | SE(PH)/EE(W/S) |
Download
|
P-145 | 14-Oct-2024 | 14.10.2024 | SE(E-II)/EE(C-I) |
Download
|
P-144 | 14-Oct-2024 | 15.10.2024 | SE(E-II)/EE(D/S) |
Download
|
P-146 | 14-Oct-2024 | 14/10/2024 | SE(E-II)/EE(C-I) |
Download
|
P-120 &R-I-06 | 11-Oct-2024 | 15.10.2024 | Tata Teleservices Ltd. |
Download
|
P-136 | 08-Oct-2024 | 09/10/2024 | IGL |
Download
|
P-106 | 08-Oct-2024 | 14.10.2024 | Embassy of Iran |
Download
|
P-139 | 07-Oct-2024 | 08/10/2024 | SE(E-II)/EE(C-II) |
Download
|
P-130 | 04-Oct-2024 | 07.10.2024 | P2P Networks Pvt. Ltd. |
Download
|
RV-30 | 03-Oct-2024 | 04/10/2024 | CPWD |
Download
|
P-118A & R-I-03 | 16-Aug-2024 | 17/08/2024 | CPWD |
Download
|
P-137 | 07-Aug-2024 | 08.08.2024 | SE(E-II)/EE(Elect.C-I) |
Download
|
RV-29 | 05-Aug-2024 | 06/08/2024 | SE(PH)/EE(W/S) |
Download
|
RV-28 | 26-Jul-2024 | 29.07.2024 | Bharti Airtel Ltd. |
Download
|
P-135 | 22-Jul-2024 | 23.07.2024 | SE(PH)/EE(W/S) |
Download
|
RV-27 | 22-Jul-2024 | 23/07/2024 | Bharti Airtel Ltd. |
Download
|
RV-26 | 18-Jul-2024 | 18/07/2024 | PGCIL |
Download
|
P-132 & R-V-13 | 18-Jul-2024 | 19.07.2024 | PGCIL |
Download
|
P-134 & R-V-14 | 18-Jul-2024 | 19.07.2024 | PGCIL |
Download
|
RV-25 | 15-Jul-2024 | 16.07.2024 | PGCIL |
Download
|
RV-118 & R-I-08 | 11-Jul-2024 | 12/07/2024 | CPWD |
Download
|
P-103 | 25-Jun-2024 | 26.06.2024 | Bharti Airtel Ltd. |
Download
|
P-96 & R-III-439 | 25-Jun-2024 | 26.06.2024 | Bharti Airtel Ltd. |
Download
|
P-124 | 24-Jun-2024 | 24.06.2024 | SE(PH)/EE(W/S) |
Download
|
P-125 | 24-Jun-2024 | 24.06.2024 | SE(E-I)/EE(M/F) |
Download
|
P-123 | 21-Jun-2024 | 22.06.2024 | SE(PH)/EE(W/S) |
Download
|
P-123 | 21-Jun-2024 | 22.06.2024 | SE(PH)/EE(W/S) |
Download
|
P-122 | 21-Jun-2024 | 22.06.2024 | NBCC |
Download
|
RV-24 | 21-Jun-2024 | 21.06.2024 | IGL |
Download
|
RV-23 | 19-Jun-2024 | 20.06.2024 | SE(E-III)/EE(C-II) |
Download
|
P-100 & R-I-02 | 18-Jun-2024 | 19.06.2024 | PGCIL |
Download
|
RV-22 | 15-Jun-2024 | 16.06.2024 | SE(E-II)/EE(D/S) |
Download
|
P-116 | 15-Jun-2024 | 18.06.2024 | SE(PH)/EE(W/S) |
Download
|
P-115 | 15-Jun-2024 | 18.06.2024 | SE(PH)/EE(W/S) |
Download
|
P-113 | 14-Jun-2024 | 14.06.2024 | Bharti Airtel Ltd. |
Download
|
P-112 | 14-Jun-2024 | 14.06.2024 | Sky Futuristic Services Pvt. Ltd. |
Download
|
P-111 | 14-Jun-2024 | 14.06.2024 | SMC INFRAST. PVT. LTD |
Download
|
P-110 | 13-Jun-2024 | 14.06.2024 | SE(E-II)/EE(D/S) |
Download
|
P-97 & R-IV-116 | 12-Jun-2024 | 13.06.2024 | NBCC |
Download
|
P-107 | 11-Jun-2024 | 12.06.2024 | SMC INFRAST. PVT. LTD |
Download
|
P-104 | 10-Jun-2024 | 11.06.2024 | SE(PH)/EE(W/S) |
Download
|
P-105 | 10-Jun-2024 | 11.06.2024 | SE(PH)/EE(W/S) |
Download
|
P-99 | 05-Jun-2024 | 06.06.2024 | SE(PH)/EE(W/S) |
Download
|
P-98 | 05-Jun-2024 | 08.06.2024 | ECIL |
Download
|
P-83 | 31-May-2024 | 01.06.2024 | CPWD |
Download
|
P-94 | 30-May-2024 | 01.06.2024 | Tata Teleservices Ltd. |
Download
|
RV-21 | 29-May-2024 | 30.05.2024 | Bharti Airtel Ltd. |
Download
|
P-92 | 27-May-2024 | 28.05.2024 | SE(PH)/EE(W/S) |
Download
|
P-91 | 24-May-2024 | 24.05.2024 | SE(PH)/EE(W/S) |
Download
|
P-88 | 17-May-2024 | 18.05.2024 | SE(E-II)/EE(C-II) |
Download
|
P-89 | 17-May-2024 | 18.05.2024 | SE(E-II)/EE(R/L) |
Download
|
P-87 | 15-May-2024 | 16.05.2024 | SE(E-II)/EE(C-II) |
Download
|
P-86 | 14-May-2024 | 15.05.2024 | JIO DIGITAL |
Download
|
P-77 | 01-May-2024 | 02/05/2024 | SE(PH)/EE(W/S) |
Download
|
P-76 | 30-Apr-2024 | 01/05/2024 | PGCIL |
Download
|
P-60 | 28-Apr-2024 | 01/04/2024 | NATIONAL MONUMENTS AUTHORITY |
Download
|
P-75 | 26-Apr-2024 | 27/04/2024 | SE(PH)/EE(W/S) |
Download
|
RV-20 | 26-Apr-2024 | 27/04/2024 | IGL |
Download
|
P-74 | 26-Apr-2024 | 27/04/2024 | SE(PH)/EE(W/S) |
Download
|
P-73 | 23-Apr-2024 | 24.04.2024 | SE(E-II)/EE(CONST-I) |
Download
|
P-71 | 22-Apr-2024 | 23.04.2024 | BSES |
Download
|
P-70 | 22-Apr-2024 | 23/04/2024 | PGCIL |
Download
|
P-72 | 22-Apr-2024 | 23.04.2024 | NBCC |
Download
|
P-68 | 15-Apr-2024 | 17/04/2024 | VODAFONE |
Download
|
P-69 | 15-Apr-2024 | 16/04/2024 | CPWD |
Download
|
P-67 | 12-Apr-2024 | 13.04.2024 | SE(E-II)/EE(CONST-I) |
Download
|
P-66 | 09-Apr-2024 | 10/04/2024 | Bharti Airtel Ltd. |
Download
|
P-65 | 08-Apr-2024 | 09/04/2024 | SE(E-II)/EE(M/F) |
Download
|
P-64 | 05-Apr-2024 | 06.04.2024 | SE(PH)/EE(W/S) |
Download
|
RV-19 | 04-Apr-2024 | 05/04/2024 | PGCIL |
Download
|
P-23(PH-II) | 04-Apr-2024 | 05/04/2024 | Uttez digital |
Download
|
P-63 | 03-Apr-2024 | 04.04.2024 | CPWD |
Download
|
P-62 | 01-Apr-2024 | 03.04.2024 | Bharti Airtel Ltd. |
Download
|
P-58 | 28-Mar-2024 | 29.03.2024 | SE(E-II)/EE(D/S) |
Download
|
P-61 | 28-Mar-2024 | 29.03.2024 | JIO DIGITAL |
Download
|
P-59 | 28-Mar-2024 | 29.03.2024 | PGCIL |
Download
|
RV-18 | 27-Mar-2024 | 28.03.2024 | SE(E-II)/EE(C-i) |
Download
|
RV-17 | 26-Mar-2024 | 27/03/2024 | SE(E-III)/EE(C-II) |
Download
|
P-56 | 26-Mar-2024 | 27.03.2024 | SE(E-III)/EE(Electric C-II) |
Download
|
P-57 | 26-Mar-2024 | 27/03/2024 | Uttez digital |
Download
|
P-55 | 21-Mar-2024 | 22/03/2024 | Tata Teleservices Ltd. |
Download
|
RV-16 | 20-Mar-2024 | 26/03/2024 | IGL |
Download
|
P-54 | 20-Mar-2024 | 21/03/2024 | CPWD |
Download
|
P-53 | 18-Mar-2024 | 19/03/2024 | IGL |
Download
|
P-36 (PH-II) | 13-Mar-2024 | 14/03/2024 | Uttez digital |
Download
|
P-52 | 13-Mar-2024 | 14/03/2024 | IGL |
Download
|
RV-15 | 12-Mar-2024 | 13/03/2024 | Bharti Airtel Ltd. |
Download
|
RV-14 | 12-Mar-2024 | 13/03/2024 | Bharti Airtel Ltd. |
Download
|
P-49 | 11-Mar-2024 | 12.03.2024 | IGL |
Download
|
P-50 | 11-Mar-2024 | 12.03.2024 | SE(E-II)/EE(MF) |
Download
|
P-51 | 11-Mar-2024 | 12/03/2024 | PGCIL |
Download
|
P-48 | 08-Mar-2024 | 09.03.2024 | MTNL |
Download
|
P-47 | 07-Mar-2024 | 08/03/2024 | SE(PH)/EE(W/S) |
Download
|
P-114 Phase-II | 07-Mar-2024 | 11.03.2024 | Uttez digital |
Download
|
P-114 (PH-II) | 07-Mar-2024 | 11.03.2024 | Uttez digital |
Download
|
P-46 | 07-Mar-2024 | 08/03/2024 | NBCC |
Download
|
P-114-phase-II | 07-Mar-2024 | 11/03/2024 | UTTEZ DIGITAL INDIA PVT. LTD |
Download
|
P-114 (PH-II) | 07-Mar-2024 | 11.03.2024 | Uttez digital |
Download
|
P-44 | 05-Mar-2024 | 06/03/2024 | PGCIL |
Download
|
P-24 (Ph-II) | 05-Mar-2024 | 06/03/2024 | vodafone |
Download
|
P-45 | 05-Mar-2024 | 06/03/2024 | RND Fiber Pvt. Ltd. |
Download
|
P-43 | 01-Mar-2024 | 02/03/2024 | SE(E-II)/EE(C-I) |
Download
|
RV-13 | 01-Mar-2024 | 02/03/2024 | CPWD |
Download
|
P-42 | 26-Feb-2024 | 27/02/2024 | PGCIL |
Download
|
P-41 | 26-Feb-2024 | 27/02/2024 | PGCIL |
Download
|
P-40 | 23-Feb-2024 | 24/02/2024 | IGL |
Download
|
P-38 | 23-Feb-2024 | 24/02/2024 | SE(E-II)/EE(C-I) |
Download
|
P-37 | 23-Feb-2024 | 24/02/2024 | SE(E-II)/EE(C-I) |
Download
|
P-39 | 23-Feb-2024 | 24/02/2024 | SE(PH)/EE(W/S) |
Download
|
P-36 | 22-Feb-2024 | 22/02/2024 | UTTEZ DIGITAL INDIA PVT. LTD |
Download
|
P-35 | 21-Feb-2024 | 22/02/2024 | IGL |
Download
|
P-34 | 20-Feb-2024 | 21/02/2024 | P2P network pvt. Ltd. |
Download
|
P-33 | 19-Feb-2024 | 20/02/2024 | P2P network pvt. Ltd. |
Download
|
RV-12 | 19-Feb-2024 | 20/02/2024 | IGL |
Download
|
RV-11 | 16-Feb-2024 | 17/02/2024 | SE(PH)/EE(W/S) |
Download
|
P-32 | 15-Feb-2024 | 16/02/2024 | SE(E-II)/EE(C-I) |
Download
|
P-31 | 14-Feb-2024 | 16/02/2024 | P2P network pvt. Ltd. |
Download
|
P-30 | 13-Feb-2024 | 14/02/2024 | SE(E-II)/EE(D/S) |
Download
|
P-29 | 13-Feb-2024 | 14/02/2024 | P2P network pvt. Ltd. |
Download
|
P-28 | 13-Feb-2024 | 13/02/2024 | BSES Yamuna Power Ltd |
Download
|
P-27 | 12-Feb-2024 | 13/02/2024 | ECIL |
Download
|
RV-10 | 09-Feb-2024 | 10/02/2024 | Bharti Airtel Ltd. |
Download
|
P-26 | 08-Feb-2024 | 09/02/2024 | SE(PH)/EE(W/S) |
Download
|
P-25 | 08-Feb-2024 | 09/02/2024 | Tata Comm. Ltd. |
Download
|
RV-09 | 07-Feb-2024 | 08/02/2024 | SE(E-I)/EE(R/L) |
Download
|
RV- 08 Revalidation | 06-Feb-2024 | 07/02/2024 | PGCIL |
Download
|
P-22 | 05-Feb-2024 | 06/02/2024 | Bharti Airtel Ltd. |
Download
|
P-23 | 05-Feb-2024 | 06/02/2024 | UTTEZ DIGITAL INDIA PVT. LTD |
Download
|
P-24 | 05-Feb-2024 | 07/02/2024 | vodafone |
Download
|
P-21 | 02-Feb-2024 | 03/02/2024 | SE(E-II)/EE(D/S) |
Download
|
RV-07 Revalidation | 02-Feb-2024 | 03/02/2024 | SE(E-III)/EE(Elect) |
Download
|
P-20 | 02-Feb-2024 | 03/02/2024 | SE(PH)/EE(W/S) |
Download
|
P-19 | 01-Feb-2024 | 02/02/2024 | MTNL |
Download
|
RV-06 | 01-Feb-2024 | 02/01/2024 | SE(PH)/EE(S/M) |
Download
|
P-18 | 01-Feb-2024 | 02/02/2024 | CPWD |
Download
|
P-17 | 01-Feb-2024 | 02/02/2024 | Central Public Work Deptt. |
Download
|
RV-05 | 31-Jan-2024 | 01/02/2024 | SE(PH)/EE(W/S) |
Download
|
P-16 | 24-Jan-2024 | 27/01/2024 | PGCIL |
Download
|
P-14 | 22-Jan-2024 | 27/01/2024 | bharti airtel ltd |
Download
|
P-15 | 22-Jan-2024 | 27/01/2024 | bharti airtel ltd |
Download
|
RV-04 Revalidation | 19-Jan-2024 | 20/01/2024 | NBCC India Ltd. |
Download
|
P-13 | 18-Jan-2024 | 19/01/2024 | SE(PH)/EE(W/S) |
Download
|
RV-03 Revalidation | 18-Jan-2024 | 19/01/2024 | SE(PH)/EE(S/M) |
Download
|
P-12 | 18-Jan-2024 | 19/01/2024 | SE(PH)/EE(S/M) |
Download
|
P-11 | 15-Jan-2024 | 16/01/2024 | SE(PH)/EE(W/S) |
Download
|
P-09 | 12-Jan-2024 | 13/01/2024 | MTNL |
Download
|
P-10 | 12-Jan-2024 | 15/01/2024 | SE(PH)/EE(S/M) |
Download
|
P-08 | 10-Jan-2024 | 11/01/2024 | SE(PH)/EE(W/S) |
Download
|
P-07 | 09-Jan-2024 | 10/01/2024 | PGCIL |
Download
|
P-06 | 09-Jan-2024 | 10/01/2024 | ECIL |
Download
|
RV-02 Rev | 09-Jan-2024 | 10/01/2024 | SE(E-II)/EE(C-II) |
Download
|
P-05 | 08-Jan-2024 | 09/01/2024 | SE(E-II)/EE(R/L) |
Download
|
P-03 | 02-Jan-2024 | 03/01/2024 | CPWD |
Download
|
P-04 | 02-Jan-2024 | 03/01/2024 | PGCIL |
Download
|
P-02 | 02-Jan-2024 | 03/01/2024 | CPWD |
Download
|
P-01 | 01-Jan-2024 | 02/01/2023 | SE(E-II)/EE(C-I) |
Download
|
01-(RV)24 Revalidation | 01-Jan-2024 | 02/01/2024 | Elect-I(BM-II) |
Download
|
P-189 | 27-Dec-2023 | 28/12/2023 | IGL |
Download
|
P-188 | 26-Dec-2023 | 27/12/2023 | MTNL (TX-JP) Kidwai Bhawan |
Download
|
P-187 | 26-Dec-2023 | 27/12/2023 | SE(E-II)/EE(C-I) |
Download
|
P-186 | 26-Dec-2023 | 27/12/2023 | SE(E-III)/EE(Elect) |
Download
|
P-185 | 22-Dec-2023 | 23/12/2023 | NBCC |
Download
|
P-185 | 22-Dec-2023 | 23/12/2023 | NBCC |
Download
|
P-184 | 22-Dec-2023 | 23/12/2023 | SE(PH)/EE(W/S) |
Download
|
P-183 | 21-Dec-2023 | 22/12/2023 | SE(PH)/EE(W/S) |
Download
|
P-182 | 20-Dec-2023 | 21/12/2023 | ECIL |
Download
|
P-181 | 20-Dec-2023 | 21/12/2023 | P2P network pvt. Ltd. |
Download
|
37 (RV) 2023 Revalidation | 18-Dec-2023 | 21/12/2023 | UTTEZ DIGITAL INDIA |
Download
|
P-180 | 18-Dec-2023 | 19/12/2023 | Tata Teleservices Ltd. |
Download
|
P-178 | 15-Dec-2023 | 16/12/2023 | Tata Teleservices Ltd. |
Download
|
P-179 | 15-Dec-2023 | 16/12/2023 | BSES Rajdhani Power Ltd. |
Download
|
P-176 | 14-Dec-2023 | 15/12/2023 | DMRC |
Download
|
P-177 | 14-Dec-2023 | 15/12/2023 | Innovatiview |
Download
|
P-175 | 14-Dec-2023 | 15/12/2023 | MTNL (TX-JB) |
Download
|
P-174 | 08-Dec-2023 | 16/12/2023 | Jio digital |
Download
|
36-RV Ist revalidation | 08-Dec-2023 | 14/12/2023 | Jio digital |
Download
|
P-172 | 08-Dec-2023 | 15/12/2023 | Jio digital |
Download
|
P-171 | 08-Dec-2023 | 09/12/2023 | IGL |
Download
|
P-173 | 08-Dec-2023 | 13/12/2023 | Jio digital |
Download
|
P-170 | 07-Dec-2023 | 11/12/2023 | Jio digital |
Download
|
35-RV IInd validation | 07-Dec-2023 | 08/12/2023 | SE(PH)/EE(W/S) |
Download
|
P-169 | 05-Dec-2023 | 06/12/2023 | SE(E-II)/EE(D/S) |
Download
|
P-168 | 01-Dec-2023 | 04/12/2023 | Tata Comm. Ltd. |
Download
|
34-RV | 30-Nov-2023 | 01/12/2023 | Elect-I(BM-II) |
Download
|
P-167 | 30-Nov-2023 | 01/12/2023 | PGCIL |
Download
|
P-166 | 29-Nov-2023 | 01/12/2023 | Yagoda Satsanga Society of India |
Download
|
P-165 | 22-Nov-2023 | 23/11/2023 | UFWS, CPWD |
Download
|
P-164 | 01-Nov-2023 | 02/11/2023 | ARG Family Trust |
Download
|
P-163 | 31-Oct-2023 | 01/11/2023 | SE(PH)/EE(S/M) |
Download
|
P-162 | 31-Oct-2023 | 01/11/2023 | PGCIL |
Download
|
P-160 | 30-Oct-2023 | 31/10/2023 | SE(E-II)/EE(C-II)) |
Download
|
P-161 | 30-Oct-2023 | 31/10/2023 | SE(E-I)/EE(R/L) |
Download
|
P-159 | 26-Oct-2023 | 27/10/2023 | SE(PH)/EE(W/S) |
Download
|
P-158 | 25-Oct-2023 | 27/10/2023 | PGCIL |
Download
|
P-155 | 16-Oct-2023 | 17/10/2023 | VODAFONE IDEA TELECOM |
Download
|
P-157 | 16-Oct-2023 | 17/10/2023 | VODAFONE IDEA TELECOM |
Download
|
P-156 | 16-Oct-2023 | 17/10/2023 | VODAFONE IDEA TELECOM |
Download
|
P-154 | 13-Oct-2023 | 14/10/2023 | NBCC (India) Ltd. |
Download
|
P-153 | 12-Oct-2023 | 13/10/2023 | SE(E-II)/EE(D/S) |
Download
|
P-151 | 11-Oct-2023 | 12/10/2023 | SE(E-II)/EE(33KV) |
Download
|
P-152 | 11-Oct-2023 | 12/10/2023 | SE(E-II)/EE(R/L) |
Download
|
P-148 | 11-Oct-2023 | 12/10/2023 | SE(E-II)/EE(E)(D/S) |
Download
|
P-147 | 11-Oct-2023 | 12/10/2023 | PGCIL |
Download
|
P-149 | 11-Oct-2023 | 12/10/2023 | SE(E-II)/EE(E)(D/S) |
Download
|
P-150 | 11-Oct-2023 | 12/10/2023 | SE(E-II)/EE(D/S) |
Download
|
P-146 | 10-Oct-2023 | 11/10/2023 | SE(E-I)/EE(C-I) |
Download
|
P-143 | 09-Oct-2023 | 10/10/2023 | CPWD |
Download
|
P-144 | 09-Oct-2023 | 10/10/2023 | Electric-I (BM-II) |
Download
|
P-145 | 09-Oct-2023 | 12/10/2023 | IGL |
Download
|
P-142 | 06-Oct-2023 | 07/10/2023 | SE(PH)/EE(W/S) |
Download
|
P-141 | 05-Oct-2023 | 06/10/2023 | SE(E-III)/EE(C-II) |
Download
|
P-140 | 05-Oct-2023 | 08/10/2023 | SE(E-I/EE(M/F) |
Download
|
P-138 | 04-Oct-2023 | 05/10/2023 | SE(E-II)/EE(E)(D/S) |
Download
|
P-137 | 04-Oct-2023 | 05/10/2023 | SE(PH)/EE(W/S) |
Download
|
P-136 | 04-Oct-2023 | 05/10/2023 | MTNL, Kidwai Bhawan |
Download
|
P-139 | 04-Oct-2023 | 05/10/2023 | M/s. IGL |
Download
|
33-(R.V)-2023 4th Revalidation | 25-Sep-2023 | 26/09/2023 | SE(PH)/EE(S/M) |
Download
|
P-135 | 20-Sep-2023 | 21/09/2023 | SE(PH)/EE(W/S) |
Download
|
P-134 | 19-Sep-2023 | 21/09/2023 | SE(PH)/EE(W/S) |
Download
|
P-133 | 01-Aug-2023 | 02/08/2023 | SE(E-II)/EE(D/S) |
Download
|
P-132 | 31-Jul-2023 | 01/08/2023 | SE(PH)/EE(W/S) |
Download
|
P-131 | 10-Jul-2023 | 10/07/2023 | SE(PH)/EE(W/S) |
Download
|
P-130 | 04-Jul-2023 | 06/07/2023 | M/s Bharti Airtel Ltd. |
Download
|
32-(R.V)-2023 2nd Revalidation | 28-Jun-2023 | 28/06/2023 | VODAFONE IDEA TELECOM |
Download
|
P-129 | 28-Jun-2023 | 28/06/2023 | SE(E-II)/EE(C-II) |
Download
|
P-128 | 28-Jun-2023 | 28/06/2023 | Gigatel Solutions Pvt. Ltd. |
Download
|
P-126 | 27-Jun-2023 | 27/06/2023 | SE(PH)/EE(SM) |
Download
|
P-125 | 27-Jun-2023 | 27/06/2023 | M/s Bharti Airtel Ltd. |
Download
|
P-127 | 27-Jun-2023 | 27/06/2023 | M/s Bharti Airtel Ltd. |
Download
|
P-124 | 26-Jun-2023 | 26/06/2023 | M/s Bharti airtel |
Download
|
31-(R.V)-2023 1st Revalidation | 26-Jun-2023 | 27/06/2023 | M/s Bharti Airtel Ltd. |
Download
|
P-123 | 26-Jun-2023 | 26/06/2023 | VODAFONE IDEA TELECOM |
Download
|
P-122 | 23-Jun-2023 | 23/06/2023 | SE(E-II)/EE(C-II) |
Download
|
P-121 | 22-Jun-2023 | 23/06/2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-120 | 21-Jun-2023 | 21/06/2023 | VODAFONE IDEA TELECOM |
Download
|
P-118 | 20-Jun-2023 | 21/06/2023 | M/s Shyam Spectra Pvt. Ltd. |
Download
|
P-119 | 20-Jun-2023 | 21/06/2023 | MTNL |
Download
|
P-116 | 19-Jun-2023 | 20/06/2023 | VODAFONE IDEA TELECOM |
Download
|
30(R.V)-2023 Revalidation | 19-Jun-2023 | 20/06/2023 | VODAFONE IDEA TELECOM |
Download
|
P-117 | 19-Jun-2023 | 20/06/2023 | SE(PH)/EE(W/S) |
Download
|
P-115 | 16-Jun-2023 | 17/06/2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-114 | 16-Jun-2023 | 17/06/2023 | Uttez Digital Pvt. Ltd. |
Download
|
P-113 | 15-Jun-2023 | 16/06/2023 | SE(PH)/EE(W/S) |
Download
|
P-112 | 13-Jun-2023 | 14/06/2023 | MOH/EE(SD) |
Download
|
29 (R.V)-2023 1st Revalidation | 13-Jun-2023 | 14/06/2023 | SE(PH)/EE(W/S) |
Download
|
28 (R.V)-2023 5th Revalidation | 12-Jun-2023 | 13/06/2023 | M/s. IGL |
Download
|
P-110 | 06-Jun-2023 | 07/06/2023 | SE(E-II)/EE(M/S) |
Download
|
P-109 | 06-Jun-2023 | 07/06/2023 | SE(E-II)/EE(M/N) |
Download
|
P-108 | 02-Jun-2023 | 03/06/2023 | SE(E-I)/EE(33KV) |
Download
|
RV. 27 Revalidation | 01-Jun-2023 | 02/06/2023 | IGL |
Download
|
P-106 | 01-Jun-2023 | 02/06/2023 | SE(PH)/EE(W/S) |
Download
|
P-107 | 01-Jun-2023 | 02/06/2023 | SE(PH)/EE(W/S) |
Download
|
26-(R.V)-2023 3rd Revalidation | 30-May-2023 | 31/05/2023 | SE(PH)/EE(S/M) |
Download
|
P-105 | 30-May-2023 | 31/05/2023 | ECIL |
Download
|
P-104 | 30-May-2023 | 31/05/2023 | SE(E-I)/EE(E)(C-I) |
Download
|
P-103 | 25-May-2023 | 26/05/2023 | VODAFONE IDEA TELECOM |
Download
|
P-102 | 24-May-2023 | 25/05/2023 | VODAFONE IDEA TELECOM |
Download
|
P-101 | 23-May-2023 | 24/05/2023 | SE(PH)/EE(W/S) |
Download
|
25-(R.V)-2023 2nd Revalidation | 23-May-2023 | 24/05/2023 | M/s. IGL |
Download
|
P-100 | 19-May-2023 | 20/05/2023 | M/s. IGL |
Download
|
P-97 | 18-May-2023 | 19/05/2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-98 | 18-May-2023 | 19/05/2023 | SE(PH)/EE(W/S) |
Download
|
P-99 | 18-May-2023 | 19/05/2023 | SE(PH)/EE(W/S) |
Download
|
P-96 | 15-May-2023 | 16/05/2023 | SE(PH)/EE(W/S) |
Download
|
P-95 | 15-May-2023 | 15/05/2023 | VODAFONE IDEA TELECOM |
Download
|
P-94 | 12-May-2023 | 13/05/2023 | Area organizer/CII Intelligence Bureau |
Download
|
P-92 | 09-May-2023 | 10/05/2023 | SE(E-II)/EE(C-I) |
Download
|
P-93 | 09-May-2023 | 10/05/2023 | VODAFONE IDEA TELECOM |
Download
|
P-91 | 04-May-2023 | 05/05/2023 | VODAFONE IDEA TELECOM |
Download
|
P-90 | 04-May-2023 | 05/05/2023 | M/s. IGL |
Download
|
P-89 | 03-May-2023 | 04/05/2023 | SE(E-I)/EE(33KV) |
Download
|
P-88 | 02-May-2023 | 03/05/2023 | SE(E-II)/EE(MS) |
Download
|
P-87 | 02-May-2023 | 03/05/2023 | SE(E-II)/EE(E)(D/S) |
Download
|
24-(R.V)-2023 4th Revalidation | 02-May-2023 | 02/05/2023 | M/s. IGL |
Download
|
P-85 | 01-May-2023 | 02/05/2023 | VODAFONE IDEA TELECOM |
Download
|
P-83 | 01-May-2023 | 02/05/2023 | VODAFONE IDEA TELECOM |
Download
|
P-86 | 01-May-2023 | 02/05/2023 | M/s Bharti Airtel Ltd. |
Download
|
P-84 | 01-May-2023 | 02/05/2023 | M/s. IGL |
Download
|
P-82 | 28-Apr-2023 | 29/04/2023 | VODAFONE IDEA TELECOM |
Download
|
23-(R.V)-2023 1st Revalidation | 28-Apr-2023 | 28/04/2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-81 | 27-Apr-2023 | 27/04/2023 | VODAFONE IDEA TELECOM |
Download
|
P-80 | 27-Apr-2023 | 28/04/2023 | SE(E-II)/EE(C-II) |
Download
|
P-79 | 26-Apr-2023 | 27/04/2023 | Tata Communication Ltd. |
Download
|
P-78 | 25-Apr-2023 | 26/04/2023 | VODAFONE IDEA TELECOM |
Download
|
P-77 | 19-Apr-2023 | 20/04/2023 | MTNL SDE (TX-JP) Kidwai Bhawan, Janpath |
Download
|
P-76 | 18-Apr-2023 | 19/04/2023 | SE(PH)/EE(W/S) |
Download
|
P-75 | 18-Apr-2023 | 19/04/2023 | SE(E-III)/EE(E)(D/S) |
Download
|
P-74 | 17-Apr-2023 | 17/04/2023 | Tata Teleservices Ltd. |
Download
|
P-73 | 13-Apr-2023 | 17/04/2023 | VODAFONE IDEA TELECOM |
Download
|
22-(R.V)-2023 1st Revalidation | 11-Apr-2023 | 12/04/2023 | SE(PH)/EE(W/S) |
Download
|
P-72 | 10-Apr-2023 | 11/04/2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-71 | 06-Apr-2023 | 07/04/2023 | SE(E-II)/EE(E)(D/S) |
Download
|
P-70 | 05-Apr-2023 | 06/04/2023 | M/s Bharti Airtel Ltd. |
Download
|
P-68 | 03-Apr-2023 | 04/04/2023 | SE(PH)/EE(SM) |
Download
|
P-69 | 03-Apr-2023 | 04/04/2023 | M/s Amelia Buldtech Pvt. Ltd. |
Download
|
21-(R.V)-2023 1st Revalidation | 03-Apr-2023 | 04/04/2023 | Vindhya Telelinks Ltd. |
Download
|
P-62 | 28-Mar-2023 | 29/03/2023 | SE(PH)/EE(W/S) |
Download
|
P-67 | 28-Mar-2023 | 29/03/2023 | Tata Teleservices Ltd. |
Download
|
P-63 | 28-Mar-2023 | 29/03/2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-65 | 28-Mar-2023 | 29/03/2023 | SE(E-II)/EE(C-II) |
Download
|
P-66 | 28-Mar-2023 | 29/03/2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-64 | 28-Mar-2023 | 29/03/2023 | IPCON |
Download
|
20-(R.V)-2023 IInd Revalidation | 27-Mar-2023 | 28.03.2023 | SE(PH)/EE(SM) |
Download
|
P-60 | 27-Mar-2023 | 28.03.2023 | M/S IPCON |
Download
|
P-61 | 27-Mar-2023 | 28.03.2023 | SE(PH)/EE(W/S) |
Download
|
P-59 | 24-Mar-2023 | 25.03.2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-58 | 24-Mar-2023 | 24.03.2023 | SE(PH)/EE(W/S) |
Download
|
19-(R.V)-2023 1st Revalidation | 24-Mar-2023 | 25.03.2023 | SE(PH)/EE(SM) |
Download
|
P-55 | 23-Mar-2023 | 24.03.2023 | Tata communications Ltd. |
Download
|
P-52 | 23-Mar-2023 | 23.03.2023 | M/s. IGL |
Download
|
P-54 | 23-Mar-2023 | 24.03.2023 | Tata communications Ltd. |
Download
|
P-57 | 23-Mar-2023 | 24.03.2023 | Tata communications Ltd. |
Download
|
P-53 | 23-Mar-2023 | 24.03.2023 | MTNL, Kidwai Bhawan |
Download
|
P-56 | 23-Mar-2023 | 24.03.2023 | SE(PH)/EE(W/S) |
Download
|
P-50 | 22-Mar-2023 | 23.03.2023 | SE(PH)/EE(W/S) |
Download
|
18-(R.V)-2023 1st Revalidation | 22-Mar-2023 | 23.03.2023 | SE(PH)/EE(S/M) |
Download
|
P-51 | 22-Mar-2023 | 23.03.2023 | SE(E-II)/EE(D/S) |
Download
|
17-(R.V)-2023 1st Revalidation | 13-Mar-2023 | 14/03/2023 | SE(E-III)/EE(E)(M/S) |
Download
|
P-49 | 13-Mar-2023 | 14/03/2023 | SE(PH)/EE(W/S) |
Download
|
P-48 | 09-Mar-2023 | 10/03/2023 | SE(PH)/EE(W/S) |
Download
|
P-47 | 07-Mar-2023 | 09/03/2023 | SE(E-II)/EE(E)(D/S) |
Download
|
P-46 | 07-Mar-2023 | 07/03/2023 | M/s Bharti RBM Holding Pvt. Ltd. |
Download
|
16-(R.V)-2023 1st Revalidation | 07-Mar-2023 | 07/03/2023 | SE(PH)/EE(S/M) |
Download
|
15-(R.V)-2023 IInd Revalidation | 06-Mar-2023 | 07/03/2023 | SE(E-I)/E(C-I) |
Download
|
14-(R.V)-2023 Ist Revalidation | 06-Mar-2023 | 06.03.2023 | M/s. IGL |
Download
|
11-(R.V)-2023 1st Revalidation | 03-Mar-2023 | 04/03/2023 | M/s. IGL |
Download
|
P-45 | 03-Mar-2023 | 04/03/2023 | SE(E-II)/E(C-I) |
Download
|
P-44 | 03-Mar-2023 | 04/03/2023 | M/s Tata Teleservices Ltd. |
Download
|
13 -(R.V)-2023 2nd Revalidation | 03-Mar-2023 | 04/03/2023 | Railtel Corporation of India Ltd |
Download
|
P-43 | 03-Mar-2023 | 04/03/2023 | M/s Bharti Airtel Ltd. |
Download
|
12 -(R.V)-2023 1st Revalidation | 03-Mar-2023 | 04/03/2023 | M/s. IGL |
Download
|
P-35 (PH-II) | 02-Mar-2023 | 04/03/2023 | M/s Bharat Electrics Ltd |
Download
|
P-42 | 01-Mar-2023 | 01/03/2023 | M/s Bharti Airtel Ltd. |
Download
|
P-40 | 27-Feb-2023 | 28/02/2023 | SE(PH)/EE(W/S) |
Download
|
P-41 | 27-Feb-2023 | 28/02/2023 | SE(PH)/EE(W/S) |
Download
|
P-39 | 23-Feb-2023 | 24/02/2023 | SE(PH)/EE(W/S) |
Download
|
P-38 | 23-Feb-2023 | 24/02/2023 | SE(E-I)/EE(E)(MN) |
Download
|
R.V. 10 Ist Revalidation | 22-Feb-2023 | 23/02/2023 | M/s. IGL |
Download
|
R.V NO. 9 | 21-Feb-2023 | 22/02/2023 | SE(PH)/EE(W/S) |
Download
|
P-37 | 15-Feb-2023 | 15/02/2023 | M/s. Telesonic Network Ltd. |
Download
|
RV-08 | 09-Feb-2023 | 10/02/2023 | M/s Uttez Digital India Pvt. Ltd |
Download
|
P-36 | 09-Feb-2023 | 09/02/2023 | M/s. IGL |
Download
|
P-35 | 08-Feb-2023 | 09/02/2023 | M/s Bharat Electronics Ltd |
Download
|
P-34 | 08-Feb-2023 | 09/02/2023 | SE(PH)/EE(S/M) |
Download
|
07-(R.V)-2023 | 07-Feb-2023 | 08/02/2023 | SE(E-I)/EE(E)(C-II) |
Download
|
P-33 | 06-Feb-2023 | 07/02/2023 | SE(PH)/EE(W/S) |
Download
|
P-32 | 06-Feb-2023 | 07/02/2023 | SE(E-II)/E(C-I) |
Download
|
P-31 | 06-Feb-2023 | 07/02/2023 | VODAFONE IDEA TELECOM |
Download
|
P-30 | 06-Feb-2023 | 07/02/2023 | VODAFONE IDEA TELECOM |
Download
|
P-29 | 03-Feb-2023 | 04/02/2023 | VODAFONE IDEA TELECOM |
Download
|
P-27 | 03-Feb-2023 | 04/02/2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-28 | 03-Feb-2023 | 06/02/2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-26 | 03-Feb-2023 | 04/02/2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-25 | 02-Feb-2023 | 03/02/2023 | M/s. IGL |
Download
|
P-24 | 01-Feb-2023 | 01/01/2023 | M/s. IGL |
Download
|
P-23 | 01-Feb-2023 | 02/02/2023 | SE(PH)/EE(W/S) |
Download
|
06-(R.V)-2023 | 30-Jan-2023 | 31/01/2023 | Vindhya Telelinks Ltd. |
Download
|
P-22 | 30-Jan-2023 | 31/01/2023 | M/s. Telesonic Network Ltd. |
Download
|
P-21 | 30-Jan-2023 | 31/01/2023 | M/s. Telesonic Network Ltd. |
Download
|
P-20 | 27-Jan-2023 | 30/01/2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-19 | 25-Jan-2023 | 30/01/2023 | M/s Jio Digital Fibre Pvt. Ltd. |
Download
|
P-18 | 24-Jan-2023 | 25/01/2023 | SE(PH)/EE(W/S) |
Download
|
P-18(A) | 19-Jan-2023 | 20/01/2023 | M/s Vindhya Telelinks Ltd. |
Download
|
P-17 | 19-Jan-2023 | 20/01/2023 | Gigatel Solutions Pvt. Ltd. |
Download
|
P-16 | 18-Jan-2023 | 19/01/2023 | SE(E-II)/EE (E)(D/S) |
Download
|
P-15 | 17-Jan-2023 | 18/01/2023 | SE(E-II)/EE(C-I) |
Download
|
RV. NO. 5 | 17-Jan-2023 | 18/01/2023 | SE(E-I)/EE(E)(C-I) |
Download
|
P-14 | 17-Jan-2023 | 18/01/2023 | SE(E-II)/EE(C-I) |
Download
|
P-13 | 13-Jan-2023 | 14/01/2023 | SE(E-II)/EE(E) (D/S) |
Download
|
P-12 | 11-Jan-2023 | 12/01/2023 | MTNL, Kidwai Bhawan |
Download
|
P. NO. 10 | 11-Jan-2023 | 12/01/2023 | SE(E-II)/EE(E)(D/S) |
Download
|
P-11 | 11-Jan-2023 | 12/01/2023 | Jio Digital Fibre Pvt. Ltd. |
Download
|
RV. NO. 04 | 10-Jan-2023 | 11/01/2023 | Telesonic Networks Ltd. |
Download
|
P-08 | 09-Jan-2023 | 10/01/2023 | SE(E-I)/EE(E)(C-I) |
Download
|
P-09 | 09-Jan-2023 | 10/01/2023 | SE(E)/EE(E-III)(D/S |
Download
|
P-07 | 05-Jan-2023 | 06/01/2023 | SE(E)/EE(E-II)(M/S) |
Download
|
RV. NO. 03 | 05-Jan-2023 | 06/01/2023 | SE(PH)/EE(S/M) |
Download
|
P-06 | 04-Jan-2023 | 05/01/2023 | SE(PH)/EE(W/S) |
Download
|
P-05 | 03-Jan-2023 | 04/01/2023 | M/s Gigatel Solution Pvt. Ltd |
Download
|
P-03 | 03-Jan-2023 | 04/01/2023 | SE(E-I)/EE(E)(R/L) |
Download
|
RV. NO-01 | 03-Jan-2023 | 04/01/2023 | SE(PH)/EE(W/S) |
Download
|
P-04 | 03-Jan-2023 | 04/01/2023 | M/s. IGL |
Download
|
RV. NO. 02 | 03-Jan-2023 | 04/01/2023 | SE(E-I)/EE(E)(C-II) |
Download
|
P-01 | 02-Jan-2023 | 03/01/2023 | SE(E-III)/EE(E)(M/S) |
Download
|
P-02 | 02-Jan-2023 | 03/01/2023 | SE(PH)/EE(W/S) |
Download
|
P-255 | 30-Dec-2022 | 31/12/2022 | SE(E-I)/EE(E)(C-II) |
Download
|
P-253 | 26-Dec-2022 | 27/12/2022 | M/s Uttez Digital India Pvt. Ltd |
Download
|
P-254 | 26-Dec-2022 | 28/12/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-231 | 24-Dec-2022 | 25/11/2022 | M/s Jio Digital Fibre Pvt. Ltd. |
Download
|
P-252 | 22-Dec-2022 | 23/12/2022 | SE(PH)/EE(W/S) |
Download
|
P-250 | 21-Dec-2022 | 22/12/2022 | Officer Commanding Army HQ SIG |
Download
|
P-251 | 21-Dec-2022 | 22/12/2022 | M/s Bharat Sanchar Nigam Ltd. |
Download
|
P-249 | 20-Dec-2022 | 21/12/2022 | M/s. IGL |
Download
|
P-248 | 20-Dec-2022 | 21/12/2022 | M/s. IGL |
Download
|
P-247 | 19-Dec-2022 | 20/12/2022 | M/s. Gigatel Solution Pvt. Ltd. |
Download
|
P-245 | 15-Dec-2022 | 16/12/2022 | SE(E)/EE(E)/(M/S) |
Download
|
P-246 | 15-Dec-2022 | 16/12/2022 | SE(E-III)/EE(E)/(M/S) |
Download
|
P-244 | 15-Dec-2022 | 16/12/2022 | SE(E-I)/EE(E)(C-I) |
Download
|
P-243 | 13-Dec-2022 | 14/12/2022 | M/s MTNL, Kidwai Bhawan |
Download
|
P-242 | 13-Dec-2022 | 14/12/2022 | SE(PH)/EE(SM) |
Download
|
P-241 | 12-Dec-2022 | 13/12/2022 | SE(PH)/EE(S/M) |
Download
|
P-240 | 08-Dec-2022 | 09/12/2022 | ECIL |
Download
|
51-(R.V)-2022 1st Revalidation | 08-Dec-2022 | 12/12/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
53-(R.V)-2022 1st Revalidation | 08-Dec-2022 | 09/12/2022 | M/s. Tata Communication Ltd. |
Download
|
54-(R.V)-2022 1st Revalidation | 08-Dec-2022 | 09/12/2022 | M/s. Telesonic Network Ltd. |
Download
|
52-(R.V)-2022 1st Revalidation | 08-Dec-2022 | 09/12/2022 | M/s Tata Communication Ltd. |
Download
|
50-(R.V)-2022 1st Revalidation | 07-Dec-2022 | 08/12/2022 | SE(PH)/EE(W/S) |
Download
|
P-239 | 07-Dec-2022 | 08/12/2022 | SE(E-I)/EE(E)(C-II) |
Download
|
P-238 | 07-Dec-2022 | 08/12/2022 | EE(Store) |
Download
|
P-236 | 30-Nov-2022 | 01/12/2022 | M/s MTNL, SDE(TX-JB) |
Download
|
RV. 49 2nd Revalidation | 30-Nov-2022 | 01/12/2022 | M/s. IGL |
Download
|
P-237 | 30-Nov-2022 | 01/12/2022 | SE(PH)/EE(W/S) |
Download
|
P-234 | 28-Nov-2022 | 29/11/2022 | M/s IPCON International Pvt. Ltd |
Download
|
P-235 | 28-Nov-2022 | 29/11/2022 | SE(PH)/EE(W/S) |
Download
|
P-233 | 28-Nov-2022 | 29/11/2022 | M/s. Telesonic Network Ltd. |
Download
|
P-232 | 25-Nov-2022 | 26/12/2022 | M/s. Telesonic Network Ltd. |
Download
|
P-229 | 23-Nov-2022 | 24/11/2022 | SE(PH)/EE(W/S) |
Download
|
P-230 | 23-Nov-2022 | 24/11/2022 | SE(PH)/EE(S/M) |
Download
|
P-228 | 22-Nov-2022 | 23/11/2022 | SE(PH)/EE(W/S) |
Download
|
P-225 | 21-Nov-2022 | 21/11/2022 | M/s Vindhya Telelinks Ltd |
Download
|
P-227 | 21-Nov-2022 | 22/11/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-224 | 21-Nov-2022 | 22/11/2022 | M/s Vindhya Telelinks Ltd |
Download
|
P-226 | 21-Nov-2022 | 22/11/2022 | SE(PH)/EE(S/M) |
Download
|
RV. 48 1st Revalidation | 18-Nov-2022 | 19/11/2022 | Railtel Corporation of India Ltd, Northern Region |
Download
|
P-223 | 18-Nov-2022 | 19/11/2022 | SE(PH)/EE(W/S) |
Download
|
P-222 | 17-Nov-2022 | 18/11/2022 | SE(PH)/EE(W/S) |
Download
|
P-220 | 17-Nov-2022 | 18/11/2022 | M/s Gigatel Solution Pvt. Ltd |
Download
|
P-221 | 17-Nov-2022 | 18/11/2022 | M/s Gigatel Solution Pvt. Ltd |
Download
|
P-219 | 15-Nov-2022 | 15/11/2022 | M/s. Telesonic Network Ltd. |
Download
|
P-217 | 14-Nov-2022 | 18/11/2022 | M/s Jio Digital Fibre Pvt. Ltd. |
Download
|
P-218 | 14-Nov-2022 | 21/11/2022 | M/s Jio Digital Fibre Pvt. Ltd. |
Download
|
P-215 | 14-Nov-2022 | 16/11/2022 | M/s Jio Digital Fibre Pvt. Ltd. |
Download
|
P-216 | 14-Nov-2022 | 16/11/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
47-(R.V)-2022 2nd Revalidation | 14-Nov-2022 | 15/11/2022 | MTNL SDE (TX-JP) Kidwai Bhawan, Janpath |
Download
|
P-212 | 14-Nov-2022 | 15/11/2022 | M/s. IGL |
Download
|
P-213 | 14-Nov-2022 | 14/11/2011 | M/s. IGL |
Download
|
45-(R.V)-2022 2nd Revalidation | 09-Nov-2022 | 09/11/2022 | M/s. Telesonic Network Ltd. |
Download
|
P-211 | 09-Nov-2022 | 10/11/2022 | M/s Tata Communication Ltd. |
Download
|
P-210 | 09-Nov-2022 | 10/11/2022 | M/s. IGL |
Download
|
46-(R.V)-2022 2nd Revalidation | 09-Nov-2022 | 09/11/2022 | M/s. Telesonic Network Ltd. |
Download
|
P-214 | 09-Nov-2022 | 10/11/2022 | M/s. IGL |
Download
|
P-209 | 02-Nov-2022 | 03/11/2022 | M/s Jio Digital Fibre Pvt. Ltd |
Download
|
P-206 | 02-Nov-2022 | 03/11/2022 | M/s Tata Teleservices Ltd. |
Download
|
P-207 | 02-Nov-2022 | 03/11/2022 | M/s Tata Teleservices Ltd. |
Download
|
P-208 | 25-Oct-2022 | 28/10/2022 | SE(PH)/EE(W/S) |
Download
|
P-205 | 21-Oct-2022 | 22/10/2022 | SE(PH)/EE(W/S) |
Download
|
P-204 | 21-Oct-2022 | 22/10/2022 | SE(E-II)/EE(E)(DN) |
Download
|
43(R.V)-2022 1st Revalidation | 21-Oct-2022 | 26/10/2022 | IGL |
Download
|
P-203 | 21-Oct-2022 | 22/10/2022 | SE(E-II)EE(E)(DN) |
Download
|
44(R.V)-2022 1st Revalidation | 21-Oct-2022 | 22/10/2022 | IGL |
Download
|
P-202 | 20-Oct-2022 | 21/10/2022 | M/s Tata Teleservices Ltd. |
Download
|
P-201 | 19-Oct-2022 | 20/10/2022 | SE(PH)/EE(W/S) |
Download
|
P-200 | 19-Oct-2022 | 20/10/2022 | SE(PH)/EE(W/S) |
Download
|
42(R.V)-2022 1st Revalidation | 18-Oct-2022 | 19/10/2022 | SE(PH)/EE(S.M) |
Download
|
41(R.V)-2022 1st Revalidation | 18-Oct-2022 | 19/10/2022 | Railtel Corporation of India Ltd, Northern Region |
Download
|
P-199 | 18-Oct-2022 | 19/10/2022 | Dir. (PMS)/Neptune India Pvt. |
Download
|
P-196 | 17-Oct-2022 | 19/102022 | M/s Tata Communication Ltd. |
Download
|
P-197 | 17-Oct-2022 | 18/10/2022 | M/s Tata Communication Ltd. |
Download
|
40(R.V)-2022 2nd Revalidation | 17-Oct-2022 | 19/10/2022 | SE(PH)/EE(W/S) |
Download
|
P-198 | 17-Oct-2022 | 19/10/2022 | MTNL, Kidwai Bhawan |
Download
|
39(R.V)-2022 1st Revalidation | 11-Oct-2022 | 14/10/2022 | IGL |
Download
|
38(R.V)-2022 1st Revalidation | 07-Oct-2022 | 10/10/2022 | SE(PH)/EE(SM) |
Download
|
P-193 | 07-Oct-2022 | 08.10.2022 | ECIL |
Download
|
P-195 | 07-Oct-2022 | 10.10.2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
P-194 | 07-Oct-2022 | 10.10.2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
37(R.V)-2022 1st Revalidation | 06-Oct-2022 | 07/10/2022 | MTNL, Kidwai Bhawan |
Download
|
P-191 | 06-Oct-2022 | 07.10.2022 | Railtel Corporation of India Ltd, Northern Region |
Download
|
35(R.V)-2022 1st Revalidation | 04-Oct-2022 | 05/10/2022 | M/s Telesonic Networks Ltd. |
Download
|
P-190 | 04-Oct-2022 | 05.10.2022 | M/s. Telesonic Network Ltd. |
Download
|
36(R.V)-2022 1st Revalidation | 04-Oct-2022 | 05/10/2022 | M/s. Telesonic Network Ltd. |
Download
|
P-189 | 29-Sep-2022 | 30.09.2022 | SE(EE-II)/EE(E) (D/S) |
Download
|
P-189 | 29-Sep-2022 | 30/09/2022 | SE(E)/EE(E)(DS) |
Download
|
P-188 | 28-Sep-2022 | 29/09/2022 | SE(E-II)EE(E)(DN) |
Download
|
P-187 | 26-Sep-2022 | 27/09/2022 | SE(PH)/EE(W/S) |
Download
|
P-185 | 22-Sep-2022 | 23/09/2022 | SE(E-II)/EE(E) (D/N) |
Download
|
P-184 | 22-Sep-2022 | 23/09/2022 | SE(PH)/EE(W/S) |
Download
|
P-186 | 22-Sep-2022 | 23/09/2022 | SE(E)/EE(E-II)(DN) |
Download
|
P-183 | 19-Sep-2022 | 20/09/2022 | Railtel Corporation of India Ltd, Northern Region |
Download
|
P-182 | 19-Sep-2022 | 20.09.2022 | SE(PH)/EE(S/P) |
Download
|
P-180 | 16-Sep-2022 | 17/09/2022 | VODAFONE IDEA TELECOM |
Download
|
P-181 | 16-Sep-2022 | 17/09/2022 | SE(E-II)/EE (E)(D/S) |
Download
|
178 | 15-Sep-2022 | 16.09.2022 | SE(PH)/EE(S/M) |
Download
|
179 | 15-Sep-2022 | 16.09.2022 | SE(PH)/EE(S/M-North) |
Download
|
33(R.V)-2022 Revalidation | 30-Aug-2022 | 01/09/2022 | SE(E)/EE(E-II)(D/S) |
Download
|
176-2022 | 24-Aug-2022 | 25/08/2022 to 08/09/2022 | SE(PH)/EE(W/S) |
Download
|
177-2022 | 24-Aug-2022 | 25/08/2022 to 08/09/2022 | SE(PH)/EE(W/S) |
Download
|
174-2022 | 17-Aug-2022 | 18/08/2022 to 01/09/2022 | SE(PH)/EE(W/S) |
Download
|
175-2022 | 17-Aug-2022 | 18/08/2022 to 24/08/2022 | SE(PH)/EE(W/S) |
Download
|
32(R.V) | 16-Aug-2022 | 17/08/2022 to 05/09/2022 | M/s. PGCIL |
Download
|
173-2022 | 10-Aug-2022 | 10/08/2022 to 15/10/2022 | SE(E-I)/EE(E)(C-II) |
Download
|
31(R.V)-2022 1st Revalidation | 29-Jun-2022 | 29/06/2022 to 30/06/2022 | M/s. PGCIL |
Download
|
171-2022 | 29-Jun-2022 | 30/06/2022 to 30/06/2022 | M/s. Sunshine India Pvt. Ltd. |
Download
|
169-2022 | 27-Jun-2022 | 28/06/2022 to 30/06/2022 | M/s. IGL |
Download
|
167-2022 | 24-Jun-2022 | 25/06/2022 to 30/06/2022 | SE(PH)/EE(W/S) |
Download
|
165-2022 | 23-Jun-2022 | 24/06/2022 to 30/06/2022 | SE(PH)/EE(W/S) |
Download
|
29-(R.V)-2022 1st Revalidation | 23-Jun-2022 | 24/06/2022 to 30/06/2022 | M/s. Jio Digital Fibre Pvt. Ltd. |
Download
|
161-2022 | 23-Jun-2022 | 24/06/2022 to 30/06/2022 | SE(PH)/EE(W/S) |
Download
|
166-2022 | 23-Jun-2022 | 24/06/2022 to 30/06/2022 | SE(PH)/EE(W/S) |
Download
|
164-2022 | 23-Jun-2022 | 24/06/2022 to 30/06/2022 | M/s. Tata Communication Ltd. |
Download
|
28(R.V)-2022 | 23-Jun-2022 | 24/06/2022 to 30/06/2022 | M/s. IGL |
Download
|
163-2022 | 22-Jun-2022 | 24/06/2022 to 30/06/2022 | M/s. Tata Communication Ltd. |
Download
|
27(R.V)-2022 1st Revalidation | 22-Jun-2022 | 23/06/2022 to 29/06/2022 | SE(PH)/EE(W/S) |
Download
|
162-2022 | 22-Jun-2022 | 24/06/2022 to 30/06/2022 | M/s. Tata Communication Ltd. |
Download
|
160-2022 | 21-Jun-2022 | 22/06/2022 to 29/06/2022 | M/s. Tata Communication Ltd. |
Download
|
168-2022 | 20-Jun-2022 | 28/06/2022 to 30/06/2022 | M/s. Tata Teleservices Ltd. |
Download
|
159-2022 | 20-Jun-2022 | 21/06/2022 to 30/06/2022 | SE(PH)/EE(W/S) |
Download
|
156-2022 | 17-Jun-2022 | 18/06/2022 to 27/06/2022 | M/s. Jio Digital Fibre Pvt. Ltd. |
Download
|
153-2022 | 15-Jun-2022 | 16/06/2022 to 30/06/2022 | SE(E)/EE(E-II)(D/S) |
Download
|
155-2022 | 15-Jun-2022 | 17/06/2022 to 30/06/2022 | M/s. Gigatel Solution Pvt. Ltd. |
Download
|
151-2022 | 14-Jun-2022 | 15/06/2022 to 24/06/2022 | M/s. Tata Communication Ltd. |
Download
|
152-2022 | 14-Jun-2022 | 15/06/2022 to 30/06/2022 | SE(E)/EE(E-II)(M/S) |
Download
|
150-2022 | 14-Jun-2022 | 15/06/2022 to 30/06/2022 | M/s. Tata Teleservices Ltd. |
Download
|
148-2022 | 13-Jun-2022 | 13/06/2022 to 30/06/2022 | SE(E-II)/EE(E) (D/N) |
Download
|
149-2022 | 13-Jun-2022 | 14/06/2022 to 30/06/2022 | M/s. Telesonic Network Ltd. |
Download
|
147-2022 | 13-Jun-2022 | 13/06/2022 to 30/06/2022 | SE(PH)/EE(W/S) |
Download
|
144-2022 | 10-Jun-2022 | 11/06/2022 to 30/06/2022 | MTNL. Kidwai Bhawan |
Download
|
145-2022 | 10-Jun-2022 | 11/06/2022 to 30/06/2022 | MTNL, Kidwai Bhawan |
Download
|
146-2022 | 10-Jun-2022 | 11/06/2022 to 30/06/2022 | SE(E-II)EE(E) (M/N) |
Download
|
26(R.V)-2022 1st revalidation | 10-Jun-2022 | 11/06/2022 to 25/06/2022 | PGCIL |
Download
|
143-2022 | 10-Jun-2022 | 11/06/2022 to 25/06/2022 | M/s. IGL |
Download
|
142-2022 | 08-Jun-2022 | 09/06/2022 to 30/06/2022 | M/s. Jio Digital Fibre Pvt. Ltd. |
Download
|
141-2022 | 08-Jun-2022 | 09/06/2022 to 28/06/2022 | Tata Communication Ltd. |
Download
|
140-2022 | 07-Jun-2022 | 08/06/2022 to 29/06/2022 | M/s. Vodafone Idea Telecom Infrastructure Ltd. |
Download
|
139-2022 | 06-Jun-2022 | 07/06/2022 to 21/06/2022 | Tata Communications Ltd. |
Download
|
138-2022 | 06-Jun-2022 | 07/06/2022 to 21/06/2022 | Tata communications Ltd. |
Download
|
137-2022 | 06-Jun-2022 | 07/06/2022 to 21/06/2022 | Tata Communication Ltd. |
Download
|
25(R.V)-2022 2nd Revalidation | 06-Jun-2022 | 07/06/2022 to 16/06/2022 | M/s. Telesonic Network Ltd. |
Download
|
136-2022 | 03-Jun-2022 | 04/06/2022 to 28/06/2022 | M/s. Telesonic Network Ltd. |
Download
|
135-2022 | 03-Jun-2022 | 04/06/2022 to 28/06/2022 | M/s. Telesonic Network Ltd. |
Download
|
134-2022 | 03-Jun-2022 | 04/06/2022 to 28/06/2022 | M/s. Telesonic Network Ltd. |
Download
|
133-2022 | 03-Jun-2022 | 06/06/2022 to 15/06/2022 | BSES Yamuna Power Ltd. |
Download
|
132-2022 | 30-May-2022 | 01/06/2022 to 30/06/2022 | Vindhya Telelinks Ltd. |
Download
|
24(R.V)-2022 1st revalidation | 30-May-2022 | 02/06/2022 to 21/06/2022 | M/s. IGL |
Download
|
131-2022 | 30-May-2022 | 02/06//2022 to 21/06/2022 | M/s. Jio Digital Fibre Pvt. Ltd. |
Download
|
130-2022 | 27-May-2022 | 30/05/2022 to 13/06/2022 | SE(E)/EE(E-II)(DN) |
Download
|
128-2022 | 27-May-2022 | 30/05/2022 to 29/06/2022 | SE(PH)/EE(SM) |
Download
|
127-2022 | 27-May-2022 | 30/05/2022 to 29/06/2022 | SE(PH)/EE(S/M) |
Download
|
129-2022 | 27-May-2022 | 30/05/2022 to 08/06/2022 | SE(PH)/EE(W/S) |
Download
|
24-2022 Phase-II | 25-May-2022 | 27/05/2022 To 26/06/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
22(R.V)2022 1st Revalidation | 23-May-2022 | 25/05/2022 to 30/06/2022 | M/s. IGL |
Download
|
125-2022 | 23-May-2022 | 25/05/2022 to 24/06/2022 | SE(PH)/EE(W/S) |
Download
|
124-2022 | 23-May-2022 | 25/05/2022 to 24/06/2022 | SE(E)/EE(E-II)(DN) |
Download
|
126-2022 | 23-May-2022 | 25/05/2022 to 13/06/2022 | ECIL |
Download
|
23 (R.V)-2022 1st revalidation | 23-May-2022 | 25/05/2022 to 08/06/2022 | SE(PH)/EE(W/S) |
Download
|
21(R.V)-2022 1st Revalidation | 23-May-2022 | 25/05/2022 to 24/06/2022 | M/s. IGL |
Download
|
40-2022 PH-II | 20-May-2022 | 23/05/2022 to 22/06/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
123-2022 | 19-May-2022 | 21/05/2022 to 09/06/2022 | Vindhya Telelinks Ltd. |
Download
|
122-2022 | 17-May-2022 | 20/05/2022 to 08/06/2022 | SE(PH)/EE(W/S) |
Download
|
117-2022 | 13-May-2022 | 15/05/2022 to 14/06/2022 | M/s. Telesonic Network Ltd. |
Download
|
120-2022 | 13-May-2022 | 15/05/2022 to 23/06/2022 | PWD, Govt. of NCT of Delhi |
Download
|
118-2022 | 13-May-2022 | 15/05/2022 to 14/06/2022 | M/s. Telesonic Network Ltd. |
Download
|
121-2022 | 13-May-2022 | 15/05/2022 to 03/06/2022 | M/s. IGL |
Download
|
116-2022 (Ph-I) | 13-May-2022 | 15/05/2022 to 13/06/2022 | M/s. Telesonic Network Ltd. |
Download
|
119-2022 | 13-May-2022 | 15/05/2022 to 23/06/2022 | M/s. Telesonic Network Ltd. |
Download
|
20(R.V)-2022 (1st Revlidation) | 13-May-2022 | 15/05/2022 to 14/06/2022 | M/s. IGL |
Download
|
111-2022 | 11-May-2022 | 13/05/2022 to 12/06/2022 | SE(PH)/EE(W/S) |
Download
|
115-2022 | 11-May-2022 | 13/05/2022 to 20/05/2022 | SE(PH)/EE(W/S) |
Download
|
113-2022 | 11-May-2022 | 13/05/2022 to 12/06/2022 | SE(PH)/EE(S/M) |
Download
|
19(R.V)-2022 1st Revalidation | 11-May-2022 | 13/05/2022 to 27/05/2022 | M/s. IPCON International (P) Ltd. |
Download
|
112-2022 | 11-May-2022 | 13/05/2022 to 12/06/2022 | SE(PH)/EE(W/S) |
Download
|
114-2022 | 11-May-2022 | 13/05/2022 to 12/06/2022 | SE(E-II)/EE(E) (D/S) |
Download
|
18-(R.V)-22 Phase-II-(1st revalidation) | 11-May-2022 | 13.05.2022 to 01.06.2022 | M/s. Telesonic Network Ltd. |
Download
|
110-2022 | 06-May-2022 | 09/05/2022 to 08/06/2022 | Railtel Corporation of India Ltd, Northern Region |
Download
|
109-2022 | 06-May-2022 | 09/05/2022 to 28/05/2022 | M/s. Jio Digital Fibre Pvt. Ltd. |
Download
|
17(R.V)-2022 | 05-May-2022 | 07/05/2022 to 21/05/2022 | M/s. Jio Digital Fibre Pvt. Ltd. |
Download
|
108-2022 | 05-May-2022 | 07/05/2022 to 06/06/2022 | SE(PH)/EE(W/S) |
Download
|
16(R.V)-2022 1st Revalidation | 28-Apr-2022 | 30/04/2022 to 09/05/2022 | SE(PH)/EE(W/S) |
Download
|
15 (R.V)-20200 2nd revalidation | 28-Apr-2022 | 30/04/2022 to 14/05/2022 | SE(PH)/EE(SM) |
Download
|
14(R.V)-2022 1st revalidation | 28-Apr-2022 | 30/04/2022 to 19/05/2022 | M/s. Jio Digital Fibre Pvt. Ltd. |
Download
|
105-2022 | 25-Apr-2022 | 27/04/2022 to 16/05/2022 | Tata Communication Ltd. |
Download
|
101-2022 | 25-Apr-2022 | 27/04/2022 to 16/05/2022 | Tata Communication Ltd. |
Download
|
102-2022 | 25-Apr-2022 | 26/04/2022 to 25/05/2022 | M/s. Telesonic Network Ltd. |
Download
|
107-2022 | 25-Apr-2022 | 28/04/2022 to 27/05/2022 | SE(PH)/EE(W/S) |
Download
|
100-2022 | 25-Apr-2022 | 27/04/2022 to 16/05/2022 | Tata Communication Ltd. |
Download
|
104-2022 | 25-Apr-2022 | 27/04/2022 to 16/05/2022 | Tata Communication Ltd. |
Download
|
13(R.V)-2022 | 25-Apr-2022 | 28/04/2022 to 17/05/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
99-2022 | 25-Apr-2022 | 27/04/2022 to 16/05/2022 | Tata Communication Ltd. |
Download
|
106-2022 | 25-Apr-2022 | 28/04/2022 to 07/05/2022 | SE(E)/EE(E-II)(DN) |
Download
|
103-2022 | 25-Apr-2022 | 27/04/2022 to 16/05/2022 | Tata Communication Ltd. |
Download
|
12(R.V)-2022 | 21-Apr-2022 | 23/04/2022 to12/05/2022 | IGL |
Download
|
98-2022 (Ph-I) | 21-Apr-2022 | 23/04/2022 to 22/05/2022 | M/s. Telesonic Network Ltd. |
Download
|
97-2022 | 20-Apr-2022 | 22/04/2022 to 21/05/2022 | M/s. Telesonic Network Ltd. |
Download
|
96-2022 | 20-Apr-2022 | 22/04/2022 to 21/05/2022 | SE(PH)/EE(W/S) |
Download
|
64-2022 (Phase-II) | 13-Apr-2022 | 14/04/2022 to 03/05/2022 | M/s. Telesonic Network Ltd. |
Download
|
95-2022 | 13-Apr-2022 | 14/04/2022 to 03/05/2022 | M/s. Gigatel Solution Pvt. Ltd. |
Download
|
91-2022 | 12-Apr-2022 | 13/04/2022 to 12/05/2022 | M/s. Telesonic Network Ltd. |
Download
|
93-2022 | 12-Apr-2022 | 13/04/2022 to 12/05/2022 | PGCIL |
Download
|
92-2022 | 12-Apr-2022 | 15/04/2022 to 04/05/2022 | SE(PH)/EE(W/S) |
Download
|
10(R.V)-2022 | 12-Apr-2022 | 15/04/2022 to 29/04/2022 | SE(PH)/EE(SM)) |
Download
|
94-2022 | 12-Apr-2022 | 13/04/2022 to 12/05/2022 | PGCIL |
Download
|
09-(R.V)-2022 | 11-Apr-2022 | 13/04/2022 to 14/05/2022 | Railtel Corporation of India Ltd, Northern Region |
Download
|
08(R.V)-2022 | 11-Apr-2022 | 13/04/2022 to 12/05/2022 | PGCIL |
Download
|
88-2022 | 06-Apr-2022 | 09/04/2022 to 08/06/2022 | SE(PH)/EE(W/S) |
Download
|
07(R.V)-2022 1st Revalidation | 06-Apr-2022 | 09/04/2022 to 08/05/2022 | SE(E)/EE(E-II)(M/S) |
Download
|
89-2022 | 06-Apr-2022 | 09/04/2022 to 18/04/2022 | SE(PH)/EE(W/S) |
Download
|
90-2022 | 06-Apr-2022 | 09/04/2022 to 28/04/2022 | SE(PH)/EE(W/S) |
Download
|
06(R.V)-2022 1st revalidation | 06-Apr-2022 | 09/04/2022 to 08/05/2022 | SE(E)/EE(E-II)(M/S) |
Download
|
87-2022 | 05-Apr-2022 | 08/04/2022 to 22/04/2022 | SE(PH)/EE(W/S) |
Download
|
84-2022 | 01-Apr-2022 | 06/04/2022 To 25/04/2022 | M/s. IGL |
Download
|
05-2022 1st revalidation | 01-Apr-2022 | 02/04/2022 to 11/04/2022 | M/s. Telesonic Network Ltd. |
Download
|
85-2022 | 01-Apr-2022 | 06/04/2022 to 05.05.2022 | M/s. IGL |
Download
|
86-2022 | 01-Apr-2022 | 02/04/2022 to 21/04/2022 | SE(PH)/EE(W/S) |
Download
|
81-2022 | 31-Mar-2022 | 01/04/2022 to 30/04/2022 | SE(PH)/EE(W/S) |
Download
|
82-2022 | 31-Mar-2022 | 01/04/2022 to 30/04/2022 | Project Director, Overseas Buildings Operations, Embassy of the USA |
Download
|
80-2022 | 31-Mar-2022 | 02/04/2022 to 11/04/2022 | M/s. IGL |
Download
|
79-2022 | 31-Mar-2022 | 02/04/2022 to 11/04/2022 | M/s. IGL |
Download
|
83-2022 | 31-Mar-2022 | 02/04/2022 to 01/05/2022 | IGL |
Download
|
78-2022 | 30-Mar-2022 | 01/04/2022 to 15/04/200 | M/s. IGL |
Download
|
75-2022 | 25-Mar-2022 | 29/03/2022 to 28/04/2022 | M/s. IPCON International (P) Ltd. |
Download
|
77-2022 | 25-Mar-2022 | 29/03/2022 to 04/04/2022 | SE(PH)/EE(W/S) |
Download
|
04-(R.V)-2022 1st Revalidation | 25-Mar-2022 | 28/03/2022 to 27/04/2022 | SE(PH)/EE(W/S) |
Download
|
76-2022 | 25-Mar-2022 | 26/03/2022 to 25/04/2022 | SE(E)/EE(E)(MS) |
Download
|
04-(R.V)-2022 1st Revalidation | 25-Mar-2022 | 28/03/2022 to 27/04/2022 | SE(PH)/EE(W/S) |
Download
|
03-(R.V)-2022 1st Revalidation | 22-Mar-2022 | 25/03/2022 to 24/04/2022 | SE(E)/EE(E-II)(M/S) |
Download
|
74-2022 | 17-Mar-2022 | 18/03/2022 to 11/04/2022 | M/s. Gigatel Solution Pvt. Ltd. |
Download
|
72-2022 | 15-Mar-2022 | 19/03/2022 to 18/04/2022 | SE(E)/EE(E-II)(C-I) |
Download
|
73-2022 | 15-Mar-2022 | 19/03/2022 to 18/04/2022 | SE(PH)/EE(W/S) |
Download
|
02(R.V)-2022 1st Revalidation | 15-Mar-2022 | 16/03/2022 to 25.03.2022 | M/s. IGL |
Download
|
01(R.V)-2022 1st Revalidation | 14-Mar-2022 | 17/03/2022 to 31/03/2022 | The officer-in-Charge, Communication Network Centre (DLI) |
Download
|
66-2022 | 09-Mar-2022 | 10/03/2022 to 09/04/2022 | Dir. (PMS)/Neptune India Ltd. |
Download
|
70-2022 | 09-Mar-2022 | 11/03/2022 to 25/03/2022 | SE(PH)/EE(S/M) |
Download
|
69-2022 | 09-Mar-2022 | 11/03/2022 to 25/03/2022 | M/s. Larsen & Toubro Ltd. |
Download
|
65-2022 | 09-Mar-2022 | 10/03/2022 to 24/03/2022 | M/s. IGL |
Download
|
71-2022 | 09-Mar-2022 | 10/03/2022 to 29/03/2022 | Dir. (PMS)/Neptune India Ltd. |
Download
|
68-2022 (1st Revalidation) | 08-Mar-2022 | 09/03/2022 to 22/04/2022 | SE(PH)/EE(S/M) |
Download
|
67-2022 | 07-Mar-2022 | 09/03/2022 to 08/04/2022 | Sh. Gulshan Kumar, Deputy Secretary, Lok Sabha Secretariat |
Download
|
64-2022 | 02-Mar-2022 | 04/03/2022 to 23/03/2022 | M/s. Telesonic Networks Ltd |
Download
|
63-2022 | 02-Mar-2022 | 05/03/2022 to 04/04/2022 | SE(PH)/EE(W/S) |
Download
|
38-2022 | 28-Feb-2022 | 29/01/2022 to 28/02/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
62-2022 | 23-Feb-2022 | 26/02/2022 to 25/03/2022 | SE(PH)/EE(W/S) |
Download
|
61-2022 | 23-Feb-2022 | 26/02/2022 to 25/03/2022 | SE(PH)/EE(W/S) |
Download
|
58-2022 | 23-Feb-2022 | 26/02/2022 to 07/03/2022 | M/s. Vodafone Idea Telecom Infrastructure Ltd. |
Download
|
60-2022 | 23-Feb-2022 | 26/02/2022 to 07/03/2022 | IGL |
Download
|
59-2022 | 23-Feb-2022 | 26/02/2022 to 12/03/2022 | M/s. Vodafone Idea Telecom Infrastructure Ltd. |
Download
|
55-2022 | 21-Feb-2022 | 23/02/2022 to 22/03/2022 | SE(PH)/EE(W/S) |
Download
|
57-2022 | 21-Feb-2022 | 23/02/2022 to 22/03/2022 | SE(PH)/EE(W/S) |
Download
|
53-2021 | 21-Feb-2022 | 23/02/2022 to 30/06/2022 | SE(PH)/EE(SM) |
Download
|
54-2021 | 21-Feb-2022 | 23/02/2022 to 30/06/2022 | SE(PH)/EE(S/M) |
Download
|
56-2022 | 21-Feb-2022 | 23/02/2022 to 09/03/2022 | IGL |
Download
|
51-2022 | 15-Feb-2022 | 18/02/2022 to 03/04/2022 | SE(PH)/EE(W/S) |
Download
|
52-2022 6th revalidation | 15-Feb-2022 | 18/02/2022 to 04/03/2022 | SE(PH)/EE(W/S) |
Download
|
50-2022 | 15-Feb-2022 | 18/02/2022 to 03/04/2022 | SE(PH)/EE(W/S) |
Download
|
49-2022 | 10-Feb-2022 | 12/02/2022 to 11/03/2022 | Gigatel Solutions Pvt. Ltd. |
Download
|
47-2022 | 07-Feb-2022 | 10/02/2022 to 09/03/2022 | SE(PH)/EE(W/S) |
Download
|
43-2022 | 07-Feb-2022 | 10/02/2022 to 24/02/2022 | IGL |
Download
|
44-2022 | 07-Feb-2022 | 10/02/2022 to 19/02/2022 | IGL |
Download
|
41-2022 | 31-Jan-2022 | 05/02/2022 to 04/03/2022 | M/s. ANI Network Pvt. Ltd. |
Download
|
39-2022 | 31-Jan-2022 | 01/02/2022 to 17/03/2022 | SE(PH)/EE(W/S) |
Download
|
28-2022 (2nd Revalidation | 31-Jan-2022 | 01/02/2022 to 28/02/2022 | Railtel Corporation of India Ltd, Northern Region |
Download
|
40-2022 | 31-Jan-2022 | 07/02/2022 to 06/03/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
20-2022 (1st revalidation) | 31-Jan-2022 | 06/02/2022 to 20/02/2022 | IGL |
Download
|
331-2022 Ph-II | 31-Jan-2022 | 02/02/2022 to 16/02/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
35-2022 | 28-Jan-2022 | 29/01/2022 to 17/02/2022 | M/s. Tata Teleservices Ltd. |
Download
|
38-2022 | 28-Jan-2022 | 29/01/2022 to 28/02/2022 | M/s. Jio Digital Fibre Pvt. Ltd. |
Download
|
34-2022 | 28-Jan-2022 | 29/01/2022 to 17/02/2022 | Tata Teleservices Ltd. |
Download
|
36-2022 1st Revalidation | 27-Jan-2022 | 29/01/2022 to 17/02/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
33-2022 | 27-Jan-2022 | 01/02/2022 to 15/03/2022 | M/s. Jio Digital Fibre Pvt. Ltd. |
Download
|
30-2022 1st Revalidation | 27-Jan-2022 | 28/01/2022 to 13/03/2022 | IGL |
Download
|
37-2022 1st Revalidation | 27-Jan-2022 | 29/01/2022 to 12/02/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
31-2022 | 27-Jan-2022 | 01/02/2022 to 01/03/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
32-2022 | 27-Jan-2022 | 01/02/2022 to 20/03/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
27-2022 | 21-Jan-2022 | 22/01/2022 to 21/02/2022 | SE(PH)/EE(W/S) |
Download
|
26-2022 | 20-Jan-2022 | 21/01/2022 to 09/02/2022 | Gigatel Solutions Pvt. Ltd. |
Download
|
25-2022 | 20-Jan-2022 | 21/01/2022 to 09/02/2022 | M/s. Tata Communications Ltd. |
Download
|
22-2022 | 14-Jan-2022 | 15/01/2022 to 03/02/2022 | SE(PH)/EE(W/S) |
Download
|
23-2022 | 14-Jan-2022 | 15/01/2022 to 29/01/2022 | Telesonic Networks Ltd. |
Download
|
21-2022 | 14-Jan-2022 | 15/01/2022 to 03/02/2022 | SE(PH)/EE(W/S) |
Download
|
22-2022 | 14-Jan-2022 | 15/01/2022 to 03/02/2022 | SE(PH)/EE(W/S) |
Download
|
21-2022 | 14-Jan-2022 | 15/01/2022 to 03/02/2022 | SE(PH)/EE(W/S) |
Download
|
19-2022 | 12-Jan-2022 | 13/01/2022 to 27/01/2022 | SE(PH)/EE(W/S) |
Download
|
18-2022 | 11-Jan-2022 | 12/01/2022 to 11/02/2022 | SE(E)/EE(E-II)(M/S) |
Download
|
12-2022 | 11-Jan-2022 | 12/01/2022 to 26/01/2022 | IGL |
Download
|
13-2022 | 11-Jan-2022 | 12/01/2022 to 26/01/2022 | IGL |
Download
|
15-2022 | 10-Jan-2022 | 11/01/2022 to 24/02/2022 | SE(PH)/EE(S/M) |
Download
|
14-2021 | 10-Jan-2022 | 11/01/2022 to 10/02/2022 | SE(PH)/EE(W/S) |
Download
|
16-2022 | 10-Jan-2022 | 11/01/2022 to 10/02/2022 | SE(E)/EE(E-II) (C-I) |
Download
|
17-2022 | 10-Jan-2022 | 11/01/2022 to 25/01/2022 | SE(PH)/EE(W/S) |
Download
|
09-2022 | 06-Jan-2022 | 07/01/2022 to 06/02/2022 | SE(PH)/EE(W/S) |
Download
|
10-2022 | 06-Jan-2022 | 10/01/2022 to 24/01/2022 | The officer-in-Charge, Communication Network Centre (DLI) |
Download
|
11-2022 | 06-Jan-2022 | 10/01/2022 to 09/03/2022 | M/s. PGCIL |
Download
|
09-2022 | 06-Jan-2022 | 07/01/2022 to 06/02/2022 | SE(PH)/EE(W/S) |
Download
|
09-2022 | 06-Jan-2022 | 07/01/2022 to 06/02/2022 | SE(PH)/EE(W/S) |
Download
|
404-2021 (PH-II) | 05-Jan-2022 | 06/01/2022 to 20/01/2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
08-2022 | 05-Jan-2022 | 06/01/2022 to 05/02/2022 | M/s. Gigatel Solutions Pvt. Ltd. |
Download
|
04-2022 | 05-Jan-2022 | 06/01/2022 to 05/02/2022 | SE(E)/EE(E-II)(M/S) |
Download
|
03-2022 | 05-Jan-2022 | 06/01/2022 to 05/03/2022 | SE(PH)/EE(S/M) |
Download
|
07-2022 | 05-Jan-2022 | 06/01/2022 to 20/01/2022 | ECIL |
Download
|
02-2022 | 05-Jan-2022 | 06/01/2022 to 25/01/2022 | SE(PH)/EE(W/S) |
Download
|
01-2022 | 05-Jan-2022 | 06/01/2022 to 05/02/2022 | SE(PH)/EE(W/S)/EE(SM) |
Download
|
05-2022 | 05-Jan-2022 | 06/01/2022 to 05/02/2022 | SE(E)/EE(E-II)(M/S) |
Download
|
06-2022 | 05-Jan-2022 | 06/01/2022 to 05/02/2022 | SE(E)/EE(E-II)(M/S) |
Download
|
468-2021 | 03-Jan-2022 | 05/01/2022 to 04/02/2022 | ANI Network Pvt. Ltd. |
Download
|
464-2021 | 31-Dec-2021 | 31/12/2021 to 30/01/2022 | M/s. Telesonic Networks Ltd. |
Download
|
467-2021 | 30-Dec-2021 | 31/12/2021 to 19/01/2022 | SE(PH)/EE(S/M) |
Download
|
465-2021 (2nd revalidation) | 30-Dec-2021 | 31/12/2021 to 14/01/2022 | SE(PH)/EE(W/S) |
Download
|
466-2021 | 30-Dec-2021 | 31/12/2021 to 14/01/2022 | SE(PH)/EE(W/S) |
Download
|
453-2021 | 28-Dec-2021 | 29/12/2021 to 17/01/2022 | ECIL |
Download
|
454-2021 | 28-Dec-2021 | 29/12/2021 to 12/01/2022 | ECIL |
Download
|
456-2021 | 28-Dec-2021 | 29/12/2021 to 12/01/2022 | ECIL |
Download
|
455-2021 | 28-Dec-2021 | 29/12/2021 to 22/01/2022 | ECIL |
Download
|
457-2021 | 28-Dec-2021 | 29/12/2021 to 12/01/2022 | ECIL |
Download
|
458-2021 | 28-Dec-2021 | 29/12/2021 to 17/01/2022 | ECIL |
Download
|
459-2021 | 28-Dec-2021 | 29/12/2021 to 12/01/2022 | ECIL |
Download
|
460-2021 | 28-Dec-2021 | 29/12/2021 to 12/01/2022 | ECIL |
Download
|
461-2021 | 28-Dec-2021 | 29/12/2021 to 12/01/2022 | M/s. Tata Communication Ltd. |
Download
|
462-2021 | 28-Dec-2021 | 29/01/2021 to 12/01/2022 | M/s. Tata Communication Ltd. |
Download
|
463-2021 | 28-Dec-2021 | 29/12/2021 to 12/01/2022 | M/s. Tata Communication Ltd. |
Download
|
463-2021 | 28-Dec-2021 | 29/12/2021 to 12/01/2022 | M/s. Tata Communication Ltd. |
Download
|
452-2021 | 28-Dec-2021 | 29/12/2021 to 17/01/2022 | ECIL |
Download
|
451-2021 | 27-Dec-2021 | 28/12/2021 to 27/01/2022 | MTNL, Kidwai Bhawan |
Download
|
445-2021 (1st Revalidation) | 21-Dec-2021 | 22/12/2021 to 21/01/2022 | M/s. Delhi Transco Ltd. |
Download
|
450-2021 (1st Revalidation | 21-Dec-2021 | 22/12/2021 to 10/01/2022 | M/s. Telesonic Networks Ltd. |
Download
|
444-2021 | 21-Dec-2021 | 22/12/2021 to 10/01/2022 | SE(PH)/EE(W/S) |
Download
|
447-2021 | 21-Dec-2021 | 22/12/2021 to 21/01/2022 | SE(E)/EE(E)(M/N) |
Download
|
446-2021 (1st revalidation) | 21-Dec-2021 | 22/12/2021 to 04/02/2022 | M/s. Delhi Transco Ltd. |
Download
|
442-2021 | 17-Dec-2021 | 18/12/2021 to 31/01/2022 | SE(PH)/EE(W/S) |
Download
|
441-2021 | 17-Dec-2021 | 18/12/2021 to 17/01/2022 | SE(PH)/EE(W/S) |
Download
|
443-2021 Ph-I | 17-Dec-2021 | 18/12/2021 to 06/01/2022 | Telesonic Networks Ltd. |
Download
|
436-2021 | 16-Dec-2021 | 17/12/2021 to 30/01/2022 | M/s. Jio Digital Fiber Pvt. Ltd. |
Download
|
437-2021 2nd Revalidation | 16-Dec-2021 | 17/12/2021 to 05/01/2022 | Gigatel Solutions Pvt. Ltd. |
Download
|
439-2021 (1st Revalidation) | 16-Dec-2021 | 17/12/2021 to 16.01.2022 | M/s. Jio Digital Fiber Pvt. Ltd. |
Download
|
440-2021 (1st Revalidation) | 16-Dec-2021 | 17/12/2021 to 31/12/2021 | M/s. Jio Digital Fiber Pvt. Ltd. |
Download
|
435-2021 | 16-Dec-2021 | 17/12/2021 to 05/01/2022 | M/s. Jio Digital Fiber Pvt. Ltd. |
Download
|
438-2021 | 16-Dec-2021 | 17/12/2021 to 16/01/2022 | SE(E)/EE(E) M/S |
Download
|
431-2021 | 14-Dec-2021 | 15/12/2021 to 03/01/2022 | M/s. Jio Digital Fiber Pvt. Ltd. |
Download
|
430-2021 1st revalidation | 14-Dec-2021 | 15/12/2021 to 14/02/2022 | SE(PH)/EE(W/S) |
Download
|
434-2021 | 14-Dec-2021 | 15/12/2021 to 03/01/2022 | M/s. Jio Digital Fiber Pvt. Ltd. |
Download
|
432-2021 | 14-Dec-2021 | 15/12/2021 to 29/12/2021 | M/s. Jio Digital Fiber Pvt. Ltd. |
Download
|
433-2021 | 14-Dec-2021 | 15/12/2021 to 03/01/2022 | M/s. Jio Digital Fiber Pvt. Ltd. |
Download
|
428-2021 | 09-Dec-2021 | 10/12/2021 to 09/01/2022 | SE(PH)/EE(W/S) |
Download
|
429-2021 (1st Revalidation) | 09-Dec-2021 | 12/12/2021 to 10/01/2022 | M/s. Telesonic Networks Ltd. |
Download
|
427-2021 | 09-Dec-2021 | 10/12/2021 to 24/12/2021 | IGL |
Download
|
425-2021 | 08-Dec-2021 | 09/12/2021 to 08/01/2022 | SE(PH)/EE(W/S) |
Download
|
422-2021 | 08-Dec-2021 | 09/12/2021 to 08/01/2022 | M/s. Tata Communications Ltd. |
Download
|
424-2021 | 08-Dec-2021 | 09/12/2021 to 22/01/2022 | IGL |
Download
|
423-2021 (2nd Revalidation) | 08-Dec-2021 | 09/12/2021 to 02/01/2022 | M/s. PGCIL |
Download
|
418-2021 | 07-Dec-2021 | 07/12/2021 to 08/01/2022 | SE(PH)/EE(W/S) |
Download
|
416-2021 | 07-Dec-2021 | 08/12/2021 to 07/01/2021 | Jio Digital Fibre Pvt. Ltd. |
Download
|
421-2021 | 07-Dec-2021 | 13/12/2021 to 12/01/2022 | SE(PH)/EE(W/S) |
Download
|
419-2021 | 07-Dec-2021 | 08/12/2021 to 07/01/2022 | SE(PH)/EE(W/S) |
Download
|
420-2021 1st Revalidation | 07-Dec-2021 | 08/12/2021 to 22/12/2021 | M/s. ECIL |
Download
|
417-2021 | 07-Dec-2021 | 08/12/2021 to 07/01/2022 | SE(PH)/EE(W/S) |
Download
|
411-2021 | 03-Dec-2021 | 04/12/2021 to 23/12/2021 | SE(PH)/EE(W/S) |
Download
|
412-2021 | 03-Dec-2021 | 04.12.2021 to 23.12.2021 | SE(PH)/EE(W/S) |
Download
|
413-2021 1st revalidation | 03-Dec-2021 | 04.12.2021 to 23.12.2021 | SE(PH)/EE(SM) |
Download
|
415-2021 | 03-Dec-2021 | 04/12/2021 to 18/12/2021 | M/s. Tata Teleservices Ltd. |
Download
|
414-2021 1st revalidation | 03-Dec-2021 | 04.12.2021 to 03.01.2022 | Jio Digital Fibre Pvt. Ltd. |
Download
|
410-2021 4th revalidation | 01-Dec-2021 | 02.12.2021 to 01.01.2022 | SE(PH)/EE(W/S) |
Download
|
408-2021 | 01-Dec-2021 | 02.12.2021 TO 21.12.2021 | SE(PH)/EE(W/S) |
Download
|
409-2021 6th revalidation | 01-Dec-2021 | 02.12.2021 to 01.01.2020 | SE(E-I)/EE (E)(C-I) |
Download
|
407-2021 | 01-Dec-2021 | 02.12.2021 TO 01.01.2022 | SE(E)/EE (E-II)(C-I) |
|